Leerjet 35/36 Developed for Training Purposes 2B-73
December 1998
Expanded Normal Procedures
Restoring from Prolonged Storage (31 Days to 6
Months)
In addition to procedures required for restoring from Flyable
Storage, the following are performed:
Engines. . . . . . . . . . . . . . . . . . . . . . PREPARE FOR SERVICE
Prepare the engines for service in accordance with “Engine
Depreservation Instructions” in TFE731-2-2B Light Engine
Maintenance Manual.
Fuel System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SERVICED
Electrical System . . . . . . . . . . . . . . . . . . . . . . . . . . SERVICED
Oxygen System . . . . . . . . . . . . . SERVICED AND CHECKED
FOR LEAKS
Alcohol Anti-Ice System . . . . . . . . . . . . . . . . . . . . SERVICED
Environmental Systems . . . . . . . . OPERATIONAL CHECKS
PERFORMED
Hydraulic System. . . . . . . . . . . . . . . CHECKED FOR LEAKS
Repair any leaks prior to flight.
Windshield and Windows . . . . . . . . PROTECTIVE COVERS
REMOVED AND STORED
Avionic Equipment . . . . . . . . . . . . . . . . . . . . . . . . SERVICED
Install all avionic equipment removed for storage. Prepare
for service in accordance with manufacturer’s recom-
mended procedures.
Pitot/Static System . . . . . . . . . . . . COVERS AND BARRIER
MATERIAL REMOVED
Landing Gear . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SERVICED