Field Option Description
Left Perpendicular offset to the left of the meas-
ured point.
☞
The angle between the line con-
necting target point and calculated
offset point and the line connect-
ing instrument station and target
point must be 90°.
Right Perpendicular offset to the right of the
measured point.
☞
The angle between the line con-
necting target point and calculated
offset point and the line connect-
ing instrument station and target
point must be 90°.
Up Longitudinal offset. Closer than the meas-
ured point.
☞
The surveying point must be on
the line between instrument sta-
tion and measured point
Down Longitudinal offset. Further away than the
measured point.
☞
The surveying point must be on
the line between instrument sta-
tion and measured point
hr Editable eld Height of the reector.
7.4.3 Angle Offset
This function calculates the target point coordinates if it is not possible to set
up the reector, or to aim at the target point directly. The offset point and the
measurement point must have the same distance to the instrument.
Select Angle Offset from the OffSet menu.
☞
Set the measured point to the left or right of the offset point. The
distance from the instrument station must be the same.
Key Description
Meas To execute a distance measurement and store the displayed
values.
Dist To execute a distance measurement.
Store To save the displayed values without executing a distance
measurment.
Shift To display Easting, Northing and Height or slope distance,
vertical angle and horizontal angle.
Description
Access
Enter offset values
and result
Apps 53