EasyManua.ls Logo

Lutz BE10 - Page 20

Default Icon
80 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
20
0698-651 Operating unit - 04/2021
en
10. Connect the plug with the circuit board of the pulse converter
(or with the ribbon cable of the protection cap).
11.Attachthepulseconverter/protectioncapontotheowmeter
and mount the caps.
12. Connect the operating unit and pulse converter / protection cap
using the data line.
Fig. 7c - Separate installation of the
operating unit
Fig. 7d - Separate installation of the
operating unit

Table of Contents