SET-UP AND INSTALLATION MLC650 VPC-MAX™ OPERATOR MANUAL
4-118
Published 04-06-18, Control # 231-14
See Figure 4-99 for the following procedure.
9. Disconnect the hydraulic hoses (4) from the
corresponding couplers (5) on the rotating bed.
10. Install the hydraulic hoses in their stored positions on the
bracket (1) on the fixed mast butt.
11. Disconnect electrical plug WMB1-P1 (2) on the mast
butt from electrical plug WRF2-J4 (3) on the rotating
bed.
12. Disconnect the SL 6 slings (1, Figure 4-100
) and SH 2
shackles (2) from the lifting links (3) on the mast top.
FIGURE 4-99
Item Description
1 Bracket
2 Electrical Plug WMB1-P1
3 Electrical Plug WRF2-J4
4 Hydraulic Hose (4 or 6)
5 Coupler (4 or 6)
Item Description
1 SL 6 Sling – 5 m (16.40 ft), 31 751 kg
(70,000 lb) (qty 2)
2 SH 2 Shackle – 17 t (18.70 USt) (qty 2)
3 Lifting Link (qty 2)
FIGURE 4-100