Voltage between phase and neutral.
Voltage between phases L1 and L2 (IT
system)
Prospective short-circuit current
Voltage drop (if available)
Contact voltage (AUTO TT only)or
Prospective fault current (AUTO TT
excepted)
Prospective short-circuit current
First fault leakage current
First fault leakage current at single fault
between L1/PE
First fault leakage current at single fault
between L2/PE
Testing of insulation monitoring devices
Threshold indicative insulation
resistance for phase 1
Threshold indicative insulation
resistance for phase 2