Commissioning
21
Installation and connection
Before commissioning, the dishwasher must
be securely installed, and the water inlet
and drain hoses and the mains cable cor-
rectly connected. Follow the instructions in
“Installation”, “Water connection” and “Elec-
trical connection” as well as the installation
plan.
Procedure
The commissioning process follows a set
procedure which cannot be interrupted.
All settings, except for water connections,
can be retrospectively altered via the
Machine functions, Settings and
Extended settings menus.
Switching on
Press the button.
Selecting a language
Commissioning starts with the selection of
the display language.
Language
deutsch
ﺍﻟﻌﺮﺑﻴﺔ
dansk
čeština
Scroll to the language you want using the
and arrow buttons and select the
language by tapping on it.
WiFi setup
In the next step, you can connect your dish-
washer to the WiFi network.
Network/WiFi
Set up WiFi?
YesNo
Select No if you do not want to integrate
the dishwasher into the WiFi network or
want to do it later.
If you select Yes, the next steps will guide
you through the process to set this up.
Please refer to “Further settings, Network-
ing/WiFi”.
Setting the temperature units
Temp. unit
°C
°F
- °C
Temperature display in Celsius.
- °F
Temperature display in Fahrenheit.
Tap to select the option you want.