3-3 
Pressure calibration 
C.O. test 
Mainstream CO
2
 test 
Leakage test 
Performance test 
Sidestream and 
Microstream 
CO
2
 tests 
Calibration 
Leakage test 
Performance test 
AG tests 
Calibration 
ICG test 
BIS test 
RM test 
Interconnecting 
function 
CCO/SvO
2
 test 
Output calibration 
Performance test 
NMT test 
Sensor check 
EEG test 
PiCCO test 
ScvO
2 
test 
Nurse call relay performance test 
Analog output performance test 
If the user suspects that the nurse call or analog 
output does not work well. 
Electrical Safety Tests 
Electrical safety tests  Refer to A Electrical Safety Inspection. 
Other Tests 
Power on test 
1. When first installed or reinstalled. 
2. Following any maintenance or the replacement of 
any main unit parts. 
Touchscreen calibration 
1. When the touchscreen appears abnormal. 
2. After the touchscreen is replaced. 
Recorder check  Following any repair or replacement of the recorder.
Network print test 
1. When first installed. 
2. Whenever the printer is serviced or replaced. 
Device integration check 
1. When first installed. 
2. Following any repair or replacement of the 
external device. 
Battery check  Functionality test
1. When first installed. 
2. Whenever a battery is replaced.