68P80801E30-A 5/1/2002 6-3
Gen 3 Site Controller System Manual Chapter 6 System Testing
Site Controller Verication
Site Controller
Verication
The cabinet verification consists of:
Section Page This section . . .
Site Controller
Verification
6-3 describes the Site Controller start up
sequence and configuration
Loading the Base
Radios
6-12 describes how to download the application
code to each Base Radio
Standby Site Controller
Status
6-14 describes how to check the status of the
standby site controller system
Base Radio
Registration
6-15 describes how to check the registration and
status of each Base Radio within the system
T1 Connection Test 6-17 describes how to locally manufacture a T1
test cable; also how to set-up and perform a
loop-back test on the T1 line
EAS/EAS2 Alarm
Checkout
6-25 describes how to verify that EAS/
EAS2-monitored site alarms work properly
GPS Status 6-29 describes how to check the alarm, GPS, and
on-line status of the GPS
Site Reference 6-31 provides a timing reference and a frequency
reference to the base radios.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Motorola iDEN Site Controller and is the answer not in the manual?

Motorola iDEN Site Controller Specifications

General IconGeneral
BrandMotorola
ModeliDEN Site Controller
CategoryController
LanguageEnglish

Related product manuals