Power-Up and Testing 4-1
4 Power-Up and Testing
4.1 Overview
Once you have performed installation of the accessories, you are ready to power up and functionally test
the dispensing system. This section covers the following topics:
Safety First
Facility Requirements
Connecting the Power and Air Supply
Powering on the Dispensing System
Starting Fluidmove for Windows (FmXP)
FmXP Configuration
Exiting Fluidmove for Windows (FmXP)
Preliminary System Check
Component-Level Functional Tests
System-Level Functional Test
4.2 Safety First
Operation of your S-920 Dispensing System involves heat, air pressure, electrical power, mechanical
devices, and the use of hazardous materials. It is essential that every person servicing or operating the
dispensing system fully understands all hazards, risks, and safety precautions. Refer to Section 2 - Safety
for additional information.
4.3 Facility Requirements
To ensure optimal performance and safety, it is necessary to install the dispensing system in a facility that
meets the requirements. If you have any questions about facility requirements, please contact Asymtek
Technical Support. See 10.2 Facility Requirements for detailed information.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Nordson Asymtek Spectrum S-920 and is the answer not in the manual?

Nordson Asymtek Spectrum S-920 Specifications

General IconGeneral
BrandNordson
ModelAsymtek Spectrum S-920
CategoryDispenser
LanguageEnglish

Related product manuals