6-34 Operation
6.11 Starting a Production Run
You are now ready to run the program with fluid. Ensure that dry mode on the Run menu is not checked
(
Figure 6-30) and click the run button. The system will find the vision targets, height sense, and dispense
in exactly the manner you have specified. All system functions from purging to measuring flow rates will
be performed.
To start a production run:
1. Verify that the main air, valve, and fluid pressures are set to the desired levels.
2. If not, adjust pressure as described in
6.5 Adjusting the Air Pressure.
3. If applicable, turn on the heaters.
! Make sure the heaters have reached the desired set point temperature before running
production.
4. In the FmXP Main Window, click on
Run a Program.
! The Production Window opens.
5. In the Production Window, click on the
Setup button and then click on Setup Scripts and
then on
Prompted Setup. See Figure 6-31.
Figure 6-31 Production Window – Setup Scripts
6. Follow the on-screen prompts and when finished, click on Exit to return to the
Production Window.
! If necessary, refer to the FmXP User Guide or Online Help for assistance.
" NOTE If the program shown in the upper left corner of the Production Window is not the desired
program, proceed with Step
7. Otherwise, skip to Step 9.