ID50 Series Panel - Installation, Commissioning & Configuration Manual
Contents
ii997-263, Issue 4
September 2002
3.3.1 Screen Termination 22
3.3.2 Ferrite Sleeves (Optional) 22
3.4 MICC Cables 22
4 Commissioning 23
4.1 Introduction 23
4.2 Preliminary Checks 23
4.3 Internal Checks 24
4.3.1 Jumper Link Options 24
4.4 External Wiring Checks 25
4.4.1 Loop Wiring 26
4.4.2 RS485 Communications Link 27
4.4.3 DC Auxiliary Output 27
4.4.4 Sounder Circuit Outputs 28
4.4.5 CFG Outputs C and D 29
4.4.6 -VE Outputs 30
4.4.7 Digital / ÜE Inputs 30
4.4.8 Switch Connections 30
4.5 Powering the Panel 31
4.5.1 Start-up Language Selection 31
4.5.2 Batteries 32
4.6 Configuration and Handover 33
4.7 Commissioning Tests 34
4.7.1 Test LEDs 34
4.7.2 Test LCD 34
4.7.3 Test Zones 34
4.7.4 Test Auto High Test 34
4.7.5 Test Outputs 34
4.7.6 Test Buzzer 34
4.7.7 Test Keyboard 34
4.8 Sensors and Modules 35
4.8.1 EN54 Requirements 35
4.8.2 Loop Wiring Testing 35
5 Configuration 36
5.1 Introduction 36
5.2 Navigation and Number Entry 36
5.3 Level 2 Configuration Options 36
5.4 Level 3 Configuration Options 37
5.5 Setup Options 38
5.5.1 Language 38