EasyManua.ls Logo

Notifier ID50 User Manual

Notifier ID50
93 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
ID50/60
installation,
commissioning &
configuration
manual
997-263, Issue 4 September 2002

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Notifier ID50 and is the answer not in the manual?

Notifier ID50 Specifications

General IconGeneral
BrandNotifier
ModelID50
CategoryFire Alarms
LanguageEnglish

Summary

Introduction

EN54 Functions

Details compliance with EN 54 Part 2/4 and optional functions with applicable clauses.

Warnings and Cautions

Advises on safety, high voltage, static-sensitive devices, and EN 54 non-compliance.

Installation Guide

Pre-installation Check List

Ensures criteria are met before installing to prevent damage or performance issues.

Product Inspection

Emphasizes checking equipment for damage before installation.

Dismantling the Panel

Recommends removing the cover and electronics for installation and safety.

Assembling the Panel

Details the procedure for reassembling the panel after installation and cabling.

RS485 Communications Link

Describes connecting the panel to repeaters via RS485, including termination resistors.

RS232 Interface Connections

Details the standard 9-way 'D'-type RS232 connector and its uses.

Cabling Instructions

Cabling Instructions

Covers compliance with wiring regulations, EN54-14, and specific cable entry rules.

Commissioning Procedures

Preliminary Checks

Lists checks to perform before connecting mains power, ensuring correct PCB and wiring.

Internal Checks

Covers jumper link configuration for panel operation, software upgrades, and locking.

External Wiring Checks

Describes procedures for checking and connecting external wiring, referencing specific sections.

Powering the Panel

Details the steps for powering up the ID50 Series panel, including battery connection.

Configuration and Handover

Guides on panel configuration after wiring and before commissioning tests.

Commissioning Tests

Lists tests to be performed after configuration to ensure proper panel operation.

Sensors and Modules

Covers EN54 requirements for isolators and loop wiring testing procedures.

Configuration Settings

Level 3 Configuration Options

Details Level 3 options for panel configuration, including setup, circuit, CBE rules, zones, access, and system.

Setup Options

Allows configuration of all panel operation settings, accessed via the Commissioning menu.

Circuit Options

Offers configuration for Signalling Line Circuit (SLC) and On-Board Output Circuits.

Control-By-Event Output Rules

Enables configuration and viewing of 64 Control-By-Event (CBE) Output Rules for engineers.

Access Options

Allows configuration of User and Commissioning engineer passcodes.

ID60 Panel Differences

Changing VIEW™™ Sensor Sensitivity

Guides on configuring sensitivity levels for alarm, day modes, and AVS groups for VIEW™ sensors.

Related product manuals