3.1 Turning power ON
35
OER-Elite OPERATION MANUAL
Ch.3
Chapter 3 Basic Operation
3.1 Turning power ON
1 Press the power switch of the reprocessor.
Figure 3.1
Connect the connection ring on the reprocessor end of the water supply hose to
the water supply hose connection port by tightening securely. An insecure
connection may lead to a risk of a water leak. For detail, refer to Section 4.4
“Connection of the water supply hose” in “Instructions-Installation Manual”.
Lighting of Heat LCG Timer indicator means that Heat LCG Timer is being
activated. For the operation during running of the Heat LCG Timer, refer to
Section 7.3, “Heat LCG Timer”.
Figure 3.2
Heat LCG Timer
indicator