3.5 Load suspension point
WARNING!
Before lifting the milling machine, check that all clamping screws of the milling table and
the spindle head are tightened.
The milling machine is lifted with a forklift on the machine base.
The clamping screws of the milling table and the spindle head bearing must be tightened.
Img.3-1: Load suspension point