Powering On the Server for the First Time 67
Powering On the Server for the First Time
These topics include instructions for powering on the server for the first time and configuring
the Oracle Solaris OS.
Step Description Links
1. Prepare the power cords. “Prepare the Power Cords” on page 67
2. Connect a serial terminal device or terminal server to
the SER MGT port.
“Connect a Terminal or Emulator to the SER MGT
Port” on page 68
3. Power on the server and start the Oracle ILOM system
console.
“Power on the System for the First Time” on page 70 or
“Configure the Preinstalled OS” on page 72
4. Configure the preinstalled OS, or install a fresh OS. “Configure the Preinstalled OS” on page 72 or
“Reach a State to Install a Fresh OS (Oracle ILOM Web
Interface)” on page 75
5. Set the configuration parameters for the Oracle Solaris
OS.
“Oracle Solaris OS Configuration Parameters” on page 77
6. (Optional) Configure the NET MGT port to use a static IP address. “Assign a Static IP Address to the NET MGT
Port” on page 80
Related Information
■
“Understanding the Server”
■
“Installing the Server”
■
“Connecting Data and Management Cables” on page 61
Prepare the Power Cords
Prepare the power cords by routing them from the AC power source to the server.
Caution - Use only the power cords provided with the server.