18
ACU-TROL
®
AK110 Chemical Controller Installation and User's Guide
SECTION 4
AK1200 FLOW CELL
Remove flow cell from shipping carton and make sure all parts are included with AK1200 flow cell.
•1–AK1200Lid •1–AK1200JarwithO-Ring
•1–Flowswitchmagnet •3-¼”Valves.
•1-Samplebarbtting •4-¼”NPTby½”exttings.
•1-FilterassemblywithO-Ring •2-¼”plugs.
•1-FlowswitchwithO-Ring,2’ •1-¼”CloseNipple
and10’wirelengthsavailable. •1-Threaded Seal Tape
•2-Mountingscrews
Notethat½”exibletubingisnotincludedandissuppliedbytheinstallerormaybeorderedfromAcu-Trol.
AK1200 Flow Cell