EasyManuals Logo

Pulsar SLUDGE FINDER 2 User Manual

Pulsar SLUDGE FINDER 2
140 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #15 background imageLoading...
Page #15 background image
Page 9
Chapter 2 Installation
Power Supply Requirements
Sludge Finder 2 can operate from AC supply or from a DC battery. The AC is
supplied via a universal 100-200VAC transformer. The DC is 22-28V. In all cases
the Sludge Finder 2 will typically consume 11W of power, with a maximum of
20W.
All electronic products are susceptible to electrostatic
shock, so follow proper grounding procedures during
installation.
Unpacking
All shipping cartons should be opened carefully. When using a box cutter, do not
plunge the blade deeply into the box, as it could potentially cut or scratch
equipment components. Carefully remove equipment from each carton checking
it against the packing list before discarding any packing material. If there is any
shortage or obvious shipping damage to the equipment, report it immediately to
Pulsar Process Measurement

Table of Contents

Other manuals for Pulsar SLUDGE FINDER 2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Pulsar SLUDGE FINDER 2 and is the answer not in the manual?

Pulsar SLUDGE FINDER 2 Specifications

General IconGeneral
BrandPulsar
ModelSLUDGE FINDER 2
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals