EasyManua.ls Logo

Rauch AXIS EMC ISOBUS - Page 59

Rauch AXIS EMC ISOBUS
102 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CAUTION!
Risk of injury due to moving machine parts
During the tests, machine parts may move automatically.
Before carrying out the tests, ensure that nobody is present in the danger zone of the
machine.
You can open and close the metering sliders with the up/down arrows.
Example: LIN bus
u
Access the menu System / Test > Test/diagnosis.
u
Select the LIN bus menu item.
The display shows the status of the actuators/sensors.
Fig. 25: System / Test; Example: Test/diagnosis
[1] Status display
[2] Start self-test
[3] Connected equipment
Linbus participant status notification
The devices indicate various conditions:
0 = OK; no equipment error
2 = blockage
4 = overload
4. Operation
AXIS EMC ISOBUS 5902180-h-gb-
59

Table of Contents

Related product manuals