Technical Bulletin PAGE: 1/2
Model: Aries-P1.5/C1.5 Date: 28-Feb-11 No.: RM077021
Subject: Additonal explanation on screw types for installing the
operation panel
Prepared by: H. Matsui
From: PPBG Service Planning Dept.
Classification:
Troubleshooting
Mechanical
Paper path
Part information
Electrical
Transmit/receive
Action required
Service manual revision
Retrofit information
Product Safety Other ( ) Tier 2
General:
Instructions on the installation procedures of the operation panel in the service manual were missing the
explanation of screw types.
This RTB has been issued to announce the additional explanation.
If the operation panel is attached using the M4x8 screws and fastened completely, the screw may contact
the control board of the operation panel due to the narrow gap between the control board and the bracket.
Although the M4x6 screws are included as accessories, the service manual does not mention that we should
use these screws to fasten the operation panel.
Action:
Please make sure the control panel is fastened with M4 x 6 screws for machines in the field.
Screw for attaching the control
panel is M4 x 6; rounded tip