Technical Bulletin PAGE: 1/6
Model: Aries-P1.5 (M077) Date: 25-Nov-11 No.: RM077052
Subject: Procedures for installing the GBC StreamPunch Prepared by: Shinnosuke Sasaki
From: 1st Tech Service Sect., PP Tech Service Dept.
Classification:
Troubleshooting
Mechanical
Paper path
Part information
Electrical
Transmit/receive
Action required
Service manual revision
Retrofit information
Product Safety Other ( ) Tier 2
Procedures for Installing the StreamPunch
directly downstream on M077/D095/G178/D016
printers and copier
1. Overview
If you wish to install the GBC StreamPunch directly downstream from a
M077/D095/G178/D016 copier/printer, do the following:
1. Order the special parts shown in the next section “2. Parts Requirement”.
2. Install the special parts according to the procedure in section “3. Installation”.
IMPORTANT
Never install the punch unit directly downstream from the main machine without
using the special parts shown in section 2 for the following reasons:
1. Possible jams
2. Possible injuries to your or customer’s hands if the door of the punch unit is
open