EasyManua.ls Logo

Rlide R2 Series - Page 95

Default Icon
159 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
93
f.
Enter to the Stake Out Roads screen.
The Operational steps are same as
point stake-out. Rotate the instrument
until the dAZ displays 0° 00'00".
Stake out
Roads
dAZ
48°5652
HD:
14.972m
* Sight Press [MSR]
OK
g.
Sight the target and then press [MSR 1]
or [MSR 2].
[MSR 1]/
[MSR 2]
Stake out
Roads
dAZ
0°0000
HD:
15.962m
* Sight Press [MSR]
OK
h.
After measuring, the deviation value
between measure point and stakeout
point is shown. 2), 3)
dHADifference in horizontal angle to
the target point
R/L: Right/Left (Lateral error)
IN/OUT: In/Out (Longitudinal error)
CUT/FIL: Cut/Fill
Stake out
Roads
1/8
dHA
0°0000”
STP
0.000m
IN
13.971m
FIL
0.743m
* Press [ENT] Rec
i.
Ask the rodman to adjust the target
position, making R/L and IN/OUT to
display 0 m.
moving towards to station
moving away from station
Stake out
Roads
1/8
dHA
0°0000”
STP
0.000m
IN
0.000m
FIL
0.743m
* Press [ENT] Rec
j.
When both R/L and IN/OUT display 0m,
it indicates the prism is on the stakeout
point.
The fifth line shows the data of fill or dig.
Stake out
Roads
1/8
dHA
0°0000”
STP
0.000m
IN
0.000m
FIL
0.201m
* Press [ENT] Rec

Table of Contents