EasyManua.ls Logo

Roche ACCU-CHEK Inform II - Linearity Testing Intervals; Information Stored During Linearity Testing

Roche ACCU-CHEK Inform II
212 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7 • Linearity Testing
90
Linearity testing intervals The linearity of the system should be checked before it is
used the first time for patient testing. The intervals for
subsequent linearity tests are determined by the facility
that operates the system. Linearity testing can also be run
when you want to check the overall performance of the
system.
Information stored during
linearity testing
The following information is stored for every linearity test:
Test result
Lot number of the linearity solution
Level of linearity solution (L1 to L6)
Operator ID (if configured)
Lot number of the test strips
Time and date of test
Comments (if applicable)

Table of Contents

Other manuals for Roche ACCU-CHEK Inform II

Related product manuals