EasyManua.ls Logo

Roche ACCU-CHEK Inform II - 7.2 Performing a linearity test

Roche ACCU-CHEK Inform II
212 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7 • Linearity Testing
92
7.2 Performing a linearity test
Overview of test procedure A linearity test comprises the following steps:
Check the lot number of the linearity solutions.
Check the lot number of the test strips.
Perform the test with a minimum of three linearity
solutions.
Starting a linearity test The following description assumes that the meter is
powered on and the Main Menu is displayed.
1 Touch in the Main Menu to open the Main
Menu 2 screen.
2 Touch Linearity to start the linearity test. The Line-
arity Test screen opens.
Linearity Test
12345678?
Use Linearity L
ot
12:48 pm
09/18/13
Main Menu
Review Results
Control Test
Patient Test
12:48 pm
09/18/13
Main Menu 2
Maintenance
Strip Lots
Profi ciency
Control Lots
Beeper
Linearity
Diagnostics
Linearity Lots
Admin.
12:48 pm
09/18/13

Table of Contents

Other manuals for Roche ACCU-CHEK Inform II

Related product manuals