EasyManua.ls Logo

Rohde & Schwarz R&S NRP - Putting into Operation; Notes on Putting into Operation; Unpacking the Meter

Rohde & Schwarz R&S NRP
350 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
R&S NRP Notes on putting into operation
1144.1400.12 1.1 E-2
1 Putting into Operation
This Chapter describes putting into operation (unpacking, AC supply connection, switching the meter on
and off), function testing and installing the meter, the preset or default settings and also contains front
and rear views of the meter.
Notes on putting into operation
Before putting the R&S NRP into operation, ensure that
the sensor inputs are not overloaded,
the meter’s outputs are not overloaded or wrongly connected,
the ventilation holes are not obstructed.
The meter may be damaged if these precautions are not observed.
Unpacking the meter
When you have removed the meter from its packing, check that nothing is missing using the delivery
note and the accessory lists.
If there is any damage, contact the carrier. Keep all the packing to support any claims for compensa-
tion.
It is also best to use the original packing if the meter has to be shipped or transported at a later date.

Table of Contents

Related product manuals