EasyManua.ls Logo

Santerno Sinus M - CHAPTER 1 - BASIC INFORMATION & PRECAUTIONS; Preparations of instruments and parts required for operation; Installation; Wiring

Santerno Sinus M
219 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1-2
Preparations
of
instruments
and parts
required for
operation
Instruments and parts to be prepared depend on how the inverter is operated. Prepare
equipment and parts as necessary.
Installation
To operate the inverter with high performance for a long time, install the inverter in a
proper place in the correct direction and with proper clearances
Wiring
Connect the power supply, motor and operation signals (control signals) to the
terminal block. Note that incorrect connection may damage the inverter and peripheral
devices

Table of Contents

Other manuals for Santerno Sinus M