35
Blower for Heat Exchanger: ON
Cooling Pump: ON
VVC: CLOSED
4. PRESSURE PULSE (phase included only on some cycles)
Band Heaters: OFF (ON as required)
Water Pump and VFB: ON as required
Steam Generator: ON
VDB: CLOSED
VEC: OPEN
Venturi Pump and VEV: ON
Blower for Heat Exchanger: ON
Cooling Pump: ON
VVC: CLOSED
5. VACUUM DRAW/ PULSE (phase included only on some cycles)
Band Heaters: OFF
Water Pump and VFB: OFF
Steam Generator: OFF
VDB: CLOSED
VEC: OPEN
Venturi Pump and VEV: ON
Blower for Heat Exchanger: ON
Cooling Pump: ON
VVC: CLOSED
6. PRESSURIZING
Band Heaters: OFF (ON as required)
Water Pump and VFB: ON as required
Steam Generator: ON
VDB: CLOSED
VEC: CLOSED
Venturi Pump and VEV: OFF
Blower for Heat Exchanger: ON
Cooling Pump: ON
VVC: CLOSED
7. STERILIZING
Band Heaters: OFF
Water Pump and VFB: OFF