36
Steam Generator: ON-OFF as required
VDB: CLOSED
VEC: CLOSED
Venturi Pump and VEV: OFF
Blower for Heat Exchanger: ON
Cooling Pump: ON
VVC: CLOSED
8. VENTING
Band Heaters: ON
Water Pump and VFB: OFF
Steam Generator: OFF
VDB: OPEN
VEC: CLOSED
Venturi Pump and VEV: OFF
Blower for Heat Exchanger: ON
Cooling Pump: ON
VVC: CLOSED
9. VACUUM DRAW
Band Heaters: ON
Water Pump and VFB: OFF
Steam Generator: ON
VDB: OPEN
VEC: OPEN
Venturi Pump and VEV: ON
Blower for Heat Exchanger: ON
Cooling Pump: ON
VVC: CLOSED
10. AIR DRYING
Band Heaters: ON (targets 170°C @132°C cycles and 150°C @ 121°C cycles)
Water Pump and VFB: OFF
Steam Generator: ON
VDB: OPEN
VEC: OPEN
Venturi Pump and VEV: ON
Blower for Heat Exchanger: ON
Cooling Pump: ON
VVC: CLOSED (OPEN for vacuum pulses and vacuum relief)