SEA SYSTEMS
INSTALLATION AND USE MANUAL
CONTROL PANEL and PREWIRED SYSTEM STK1
For Electric and Hydraulic Lifts
MSTK12-GB
Rev.01
30/12/05
SETRONIK1 Pagina 13 di 54
Fig. 2.7 – Sequence of operations to plug in series to the shaft line
Press the conductors between no-pull,
sealing arms
Position the upper and lower sections of
the connector…
…. and tighten with a wrench.
Male connector plugging into a female
connector
3-pin open female connector:
- 3- cutting blade
4- L cable (phase) cut and contacted, no peeling
5- Contacted ground cable, no peeling