EasyManua.ls Logo

Segway SNARLER ATV 2021 Series - Cylinder, Piston Installation

Segway SNARLER ATV 2021 Series
386 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ENGINE TOP END
ENGINE TOP END
3-5-30
Cylinder, Piston Installation
Cylinder, Piston Installation
NOTE
NOTE
If a new piston or cylinder is used, check piston to
cylinder clearance (see Piston/Cylinder Clearance), and
use new piston rings.
The oil ring rails have no “top” or “bottom”.
Install the oil ring expander
A
in the bottom piston
ring groove so the ends
B
butt together.
Install the oil ring steel rails, one above the expander
and one below it.
Spread the rail with your thumbs, but only enough to
t the rail over the piston.
Release the rail into the bottom piston ring groove.
Do not mix up the top ring and second ring.
Install the top ring
A
so that the “A1” mark
B
faces up.
Install the second ring
C
so that the “A2” mark
D
faces up.
The piston ring openings must be positioned as
shown in the fi gure. The openings of the oil ring steel
rails must be about 30° ~ 40°
F
of angle from the
opening of the top ring.
Top Ring
A
Second Ring
B
Oil Ring Steel Rails
C
Oil Ring Expander
D
Note the piston orientation mark (EX) located on
top of the piston. (EX) should point toward the
exhaust side.
Opening Positions
G
Fit a new piston pin snap ring into the side of the
piston so that the ring opening
A
does not
coincide with the slit
B
of the piston pin hole.
When installing the piston pin snap ring, compress it
only enough to install it and no more.
Apply engine oil to the cylinder bore and, piston
skirt.
A
A
B
B
C
C
D
D
A
A
B
B
A
A
B
B
B
B
C
C
C
C
C
C
E
E
G
G
G
G
G
G
D
D
F
F
F
F
A
A
A
A
B
B

Table of Contents

Related product manuals