EasyManua.ls Logo

Seiki VS50 - When Completing the Daily Operation

Seiki VS50
139 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1 - 21
3-4 When Completing the Daily Operation
(1) Confirm that START display lamp on the main operation panel is lit off.
(2)
Press EMERGENCY STOP button on the main operation panel.
(3) Clean the machine.
(4) Release EMERGENCY STOP button on the main operation panel.
(5) Set operation preparation, and drive the conveyor.
(6) Stop the conveyor after all of cutting chips in the bed are discharged.
(7) Move each axis to the stop position.
X-axis ......... center of the stroke
Y-axis .......... center of the stroke
Z-axis.......... the head upward movement end
(8)
Press EMERGENCY STOP button on the main operation panel.
(9)
Press POWER OFF button of the main control panel to cut out the control device power.
(10) Cut out power of the high voltage control panel.
(11) Cut out supply power.

Table of Contents