EasyManua.ls Logo

Seiki VS50 - Operational Procedures; When Starting the Machine

Seiki VS50
139 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1 - 18
Caution
Caution
3. Operational Procedures
3-1 When Starting the Machine
(1) Turn on the supply power Switch.
(2) Turn on the power switch on the electric cabinets
(3) Press the POWER ON push button switch located on the upper part of the main operation
panel.
The main panel and NC cabinet are enclosed lest the open air should enter
directly. Therefore, do not leave each door open for a long time while the power
is turned on. Check on the display and that cooling fan motors inside and
outside the cabinet are started.
(4)
Release EMERGENCY STOP button on the main operation panel.
(5)
Press the STANDBY push button switch located of the main operation panel. (A green
lamp lights up.)
(6) Before starting daily operation, reciprocate the X, Y and Z axes several times. (When this
is done, be careful not to have the axes overtravelled.)
(7) Return each axis to the zero point (refer to the description for zero return). By performing
zero return, a basic machine coordinate system is set and stored stroke limits are made
effective.
(8) Turn on the conveyor switch.
Do not make operation under the state that massive chips are cast in the trough.

Table of Contents