Setting functions
8.9 Safe Torque Off (STO) safety function
Converter with control units CU250D-2
Operating Instructions, 04/2014, FW V4.7, A5E34261542B AA
251
Documentation of the inverter
The following must be documented for the inverter:
● The results of the acceptance test.
● The settings of the integrated drive safety functions.
The commissioning tool STARTER logs the settings of the integrated drive functions, if
necessary. See also Section: Documents for acceptance (Page 252).
The documentation must be signed.
Who may perform the acceptance test of the inverter?
Personnel from the machine manufacturer, who, on account of their technical qualifications
and knowledge of the safety functions, are in a position to perform the acceptance test in the
correct manner are authorized to perform the acceptance testing of the inverter.
Reduced acceptance after functions have been expanded
A full acceptance test is necessary only after first commissioning. A reduced acceptance test
is sufficient when safety functions are expanded.
Functional expansion of the
machine (additional drive).
Yes.
Only check the safety
functions of the new
drive.
• Supplement machine overview
• Supplement inverter data
• Add function table
• Log the new checksums
• Countersignature
Transfer of inverter settings to
other identical machines by means
of series commissioning.
No.
Only check the control
of all of the safety
• Add machine description
• Check checksums
• Check firmware versions