Acceptance test and acceptance report 
  10.2 Acceptance test structure 
Safety Integrated 
Function Manual, 05/2010, A5E03264275A 
249 
4.  Test of the SI function "Safe Stop 2" (SS2) 
–  Only required when used in Extended Functions 
–  This test is also required if you are not explicitly using SS2 but just one function for 
which STOP C occurs as a fault reaction. 
Alternatively, you can also carry out the quality test using STOP C yourself, if you use 
the table from section "Acceptance test for Safe Stop 2 (Extended Functions)". 
–  Trace recording is required 
5.  Test of the SI function "Safe Operating Stop" (SOS) 
–  Only required when used in Extended Functions 
–  This test is also required if you are not explicitly using SOS, but just one function for 
which STOP C or STOP D occurs as a fault reaction. 
Alternatively, you can also perform the quality test using STOP C and STOP D 
yourself, if you use the table from section "Acceptance test for Safe Operating Stop 
(Extended Functions)". 
–  Trace recording is required 
6.  Test of the SI function "Safely Limited Speed" (SLS) 
–  Only required when used in Extended Functions 
–  Trace recordings are required for each SLS limit 
7.  Test of the SI function "Safe Speed Monitor" (SSM) 
–  Only required when used in Extended Functions 
–  Trace recording is required 
C) Functional testing of forced dormant error detection 
Test of the forced dormant error detection of the safety functions on each drive (for each 
control mode) and the TM54F (if used). 
1.  Test of the forced dormant error detection of the safety function on the drive 
–  If you are using Basic Functions, you need to activate and then deactivate STO once 
again. 
–  If you are using Extended Functions, you need to carry out a test stop. 
2.  Test of the forced dormant error detection of the TM54F (if present) 
–  Only if Extended Functions are used 
–  Carry out test stop of the TM54F 
D) Conclusion of the report 
Report of the commissioning status tested and countersignatures 
1.  Inspection of SI parameters 
2.  Logging of checksums (for each drive) 
3.  Issuing of the Safety password and documenting this process (do not specify the Safety 
password in the report!) 
4.  RAM to ROM backup, upload of project data to STARTER, and backup of the project 
5.  Countersignature