31
GB
NET-VISION 7 - SOCOMEC
17.2. BATTERY TEST
This function gives the possibility to send an immediate battery test to the UPS.
The result of the last battery test, if any, is reported in the page.
For single or modular units or parallel systems with shared battery:
Battery Test
Battery test status Last Battery test* Result Next test (in day) Battery test control
Disabled
In progress
On standby
Programmed
Enabled
day/month
No test
OK
Interrupted
Failed
0 if not pro-
grammed
Available if the remote
controls are enabled
by the UPS and the
battery test is possible
For parallel systems with distributed battery (only VU-MAP compliancy UPS):
Battery Test
Unit Battery test status Last Battery test* Result Next test (in day) Battery test control
1
Disabled
In progress
On standby
Programmed
Enabled”
day/month
No test
OK
Interrupted
Failed
0 if not pro-
grammed
Available if the remote
controls are enabled
by the UPS and the
battery test is possible
2 Disabled
00/00
No test 0
(*) Only for VU-MAP UPS compliancy
17.3. BATTERY TEST SCHEDULE
This function is available only for VU-MAP compliancy UPS.
The battery test can be programmed automatically to start on a specic day and hours with a
frequency given in weeks:
Battery Test Schedule
Week interval Day Hours
Disabled
1
…
52
Monday
…
Sunday
00
Only if remote
controls are
enabled by
UPS
For parallel systems with distributed battery, the battery test schedule can be programmed unit by unit.
Each battery test will be started at different time.