Operation 4
Parking, decommissioning
3 Preselector switch, additional lift
Additional lift
Before actuating the operating rocker switch
for (1) or (2), press button (3).
1Preselec
tion additional lift
2Lift
3 Lower
4 Not as
signed
Additional lift, load-side operation
This truck can optionally be equipped with
load-side operation for the additional lift.
Park
ing, decommissioning
Par
king and leaving the truck
NOTE
52
13 804 2501 EN - 01/2016 69