5.1.3
Connections overview
Connections:
Open the connection compartment by removing front cover:
Any unused cable entry on the device must be sealed to prevent any intrusion. An intrusion
of small animals in the unit may cause serious damages not covered by the warranty.
AC-Source
AC-Flex
AC-Loads
PV Switch
-BAT
+BAT
Sunclix
connectors
for PV
High current
protective earth
connection
Communication
and I/O
AC-Source
L1-L2-L3-N
AC-Flex
L1-L2-L3-N
AC-Loads
L1-L2-L3-N
BAT-
BAT+
AC PE earth
connection
Button
battery for
clock (RTC)

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Studer NEXT3 and is the answer not in the manual?

Studer NEXT3 Specifications

General IconGeneral
BrandStuder
ModelNEXT3
CategoryIndustrial Equipment
LanguageEnglish