EasyManua.ls Logo

Sungrow SH5.0RT - Page 20

Sungrow SH5.0RT
128 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
If the Smart Energy Meter is abnormal or not equipped, the inverter will run normally, how-
ever, the battery can be charged but not allowed to discharge. In this case the feed-in power
setting will be ineffective, and the DO function for optimized mode will be disabled.
Energy Management during Daytime
The energy management system (EMS) works in self-consumption mode by default.
Scenario 1: PV power generation Load power consumption
FirstPV power will go to Backup loads first, then normal loads and the battery.
MoreoverIf the battery is fully charged, the excess will go to the grid. The feed-in
power will not surpass the feed-in limitation value in initial settings.
Scenario 2: PV power generation Load power consumption
Firstbattery will discharge and provide the energy missing.
Moreoverinverter will draw power from the mains if the power from the PV and bat-
tery is less than the load power.
With current No current
Energy Management during Night
During night, with energy available, the battery will discharge to supply power for loads. Al-
ternatively, the grid will supply power for the loads in case the discharge power of the battery
is insufficient.
2 Product Description User Manual

Table of Contents

Other manuals for Sungrow SH5.0RT

Related product manuals