Network Service Provider Grid Type
United Energy
• UE-ST-2008.1: ≤ 10 kVA for single-
phase & 30 kVA for three-phase
• UE-ST-2008.2: > 30 kVA three-phase
PowerWater
Embedded Generation Notice Photovoltaic
Systems:2020
SA Power Networks
• TS129-2019: < 10 kW for single-phase
& 30 kW for three-phase
• TS130-2017: > 30 kW & ≤ 200 kW
• TS131-2018: > 200 kW
Horizon Power
• HPC-9DJ-13-0001-2019: ≤ 10kVA for
single-phase & 30 kVA for three-phase
• HPC-9DJ-13-0002-2019: > 30kVA &
≤1MVA
westernpower
EDM#33612889-2019
AusNet Services Basic Micro Embedded Generation: 2020
* For compliance with AS/NZS 4777.2:2020, please select from Australia A/B/C. Please con-
tact your electricity grid operator for which region to use.
step 5 Initialize parameters according to local grid requirements, including grid type, reactive power
regulation mode, etc. The screen displays that the inverter is successfully configured.
figure 7-10 Initializing Parameters
- - End
7.6 Configuring the Plant
The inverter is successfully added to the plant and initialized. Refer to the guidance in pre-
vious sections.