EasyManua.ls Logo

Sungrow SH5.0RT - Plant Configuration

Sungrow SH5.0RT
128 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
73
Network Service Provider Grid Type
United Energy
UE-ST-2008.1: 10 kVA for single-
phase & 30 kVA for three-phase
UE-ST-2008.2: 30 kVA three-phase
PowerWater
Embedded Generation Notice Photovoltaic
Systems:2020
SA Power Networks
TS129-2019: < 10 kW for single-phase
& 30 kW for three-phase
TS130-2017: > 30 kW & 200 kW
TS131-2018: > 200 kW
Horizon Power
HPC-9DJ-13-0001-2019: 10kVA for
single-phase & 30 kVA for three-phase
HPC-9DJ-13-0002-2019: > 30kVA &
≤1MVA
westernpower
EDM33612889-2019
AusNet Services Basic Micro Embedded Generation: 2020
* For compliance with AS/NZS 4777.2:2020, please select from Australia A/B/C. Please con-
tact your electricity grid operator for which region to use.
step 5 Initialize parameters according to local grid requirements, including grid type, reactive power
regulation mode, etc. The screen displays that the inverter is successfully configured.
figure 7-10 Initializing Parameters
- - End
7.6 Configuring the Plant
The inverter is successfully added to the plant and initialized. Refer to the guidance in pre-
vious sections.
User Manual 7 Commissioning

Table of Contents

Other manuals for Sungrow SH5.0RT

Related product manuals