27
5.2.4 Clearance Requirements
Reserve enough clearance around the inverter to ensure sufficient space for heat
dissipation.
In case of multiple inverters, reserve specific clearance between the inverters.
Install the inverter at an appropriate height for ease of viewing LED indicator and operating
switch(es).
5.3 Installation Tools
Installation tools include but are not limited to the following recommended ones. If necessary,
use other auxiliary tools on site.
Goggles Earplugs Dust mask Protective gloves
Insulated shoes Utility knife Slotted screwdriver
(M4)
Phillips screwdriver
(M4)
User Manual 5 Mechanical Mounting