EasyManua.ls Logo

Sungrow SH5.0RT - AC Cable Connection; AC Side Requirements

Sungrow SH5.0RT
128 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
38
(1) Heat shrink tubing (2) OT/DT terminal
step 2 Remove the screw on the grounding terminal and fasten the cable with a screwdriver.
step 3 Apply paint to the grounding terminal to ensure corrosion resistance.
- - End
6.5 AC Cable Connection
6.5.1 AC Side Requirements
Connect the inverter to the grid only after getting an approval from the local elec-
tric power company.
6 Electrical Connection User Manual

Table of Contents

Other manuals for Sungrow SH5.0RT

Related product manuals