EasyManua.ls Logo

Suzuki LT-A750X/P - Page 163

Suzuki LT-A750X/P
711 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Engine Mechanical: 1D-12
Apply a thin coat of engine oil to the O-ring and install
the ISC valve assembly.
CAUTION
!
Replace the O-ring with a new one.
Special tool
: 09930–11950 (Torx wrench)
Tightening torque
ISC valve mounting screw (a): 2 N·m (0.2 kgf-m,
1.5 lb-ft)
Apply a thin coat of engine oil to the new cushion seal
(2) and the O-ring (3).
CAUTION
!
Replace the cushion seal and O-ring with the
new ones.
Install the fuel injector (4) by pushing it straight to the
throttle body.
CAUTION
!
Never turn the injector while pushing it.
Install the fuel delivery pipe assembly (5) to the fuel
injector.
CAUTION
!
Never turn the fuel injector while installing
them.
Tighten the fuel delivery pipe mounting screws to the
specified torque.
Tightening torque
Fuel delivery pipe mounting screw (b): 5 N·m (0.5
kgf-m, 3.5 lb-ft)
I831G1140044-01
2
3
I831G1140046-01
4
I831G1140047-01
(b)
I831G1140048-01

Table of Contents

Related product manuals