6-8 COOLING SYSTEM
Oil
INSTALLATION
• Install the O-ring 1.
• Tighten the cooling fan thermo-switch to the specified torque.
' Cooling fan thermo-switch: 17 N
.
m
(1.7 kgf
.
m, 12.5 lb-ft)
• Install the radiator.
ENGINE COOLANT TEMPERATURE
SWITCH
REMOVAL
• Remove the radiator. (#6-4)
• Remove the engine coolant temperature switch 1.
INSPECTION
• Inspect the engine coolant temperature switch in the same
manner of the cooling fan thermo-switch inspection.
$ Engine coolant temp. switch operating temperature
Standard (OFF → ON): Approx. 120°C (248°F)
(ON → OFF): Approx. 113°C (235.4°F)
!
Do not allow the switch to touch the pan, or false read-
ing will result.
• Apply grease to the O-ring
( 99000-25030: SUZUKI SUPER GREASE “A” (For USA)
99000-25010: SUZUKI SUPER GREASE “A”
(For the others)
• Tighten the engine coolant temperature switch to the specified
torque.
' Engine coolant temperature switch:
12 N
.
m (1.2 kgf
.
m, 8.5 lb-ft)
• Install the radiator. (#6-5)