18-72 VL800/C/TK9 (’09-MODEL)
PAIR (AIR SUPPLY) SYSTEM HOSE ROUTING
*1
Fit hose ends onto hose joint all the way until
stopper flange is securely contacted. Align
hose clamp end with matching mark.
*4
Tighten bolts with PAIR pipe slightly tensioned
clockwise.
*2 Hose should not contact throttle valve pulley. *5 Hose clamp end should face downward.
*3
The sealant side of the gasket should face the
PAIR pipe.
*6
Clamp the lead wire and hoses so as not to
contact to the engine fins.
*1
Matching mark
(Blue)
Approx. 45˚
*2
Matching mark
(White)
*3
PAIR pipe
*4
Matching
mark
(Yellow)
*5
PAIR control solenoid
valve lead wire
*6
PAIR control solenoid valve