CHASSIS 7-17
• When installing the brake light switch, align the projection on
the switch with the hole in the master cylinder.
• When remounting the master cylinder onto the handlebars, align
the master cylinder holder’s mating surface 1 with the punch
mark 2 on the handlebars and tighten the upper clamp bolt
first.
$ Master cylinder mount bolt: 10 N
.
m (1.0 kgf
.
m, 7.0 lb-ft)
• Tighten the brake hose union bo t to the specified torque.
• For assembly procedure of brake hose. ("9-18)
$ Brake hose union bolt: 23 N m (2.3 kgf
.
m, 16.5 lb-ft)
!
Bleed air from the brake system after installing the mas-
ter cylinder. ("2 17)
Upper
clamp
bolt
Master cylinder
Handlebar
Clearance
Punched
mark