EasyManua.ls Logo

Suzuki VL800 - Page 210

Suzuki VL800
639 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7-34 CHASSIS
Forward
Punch mark
Clearance
HANDLEBARS
When setting the handlebar clamp to the handlebar holder of
the steering upper bracket, face the punched mark A on its
clamp forward.
First, tighten the handlebar clamp bolts 1 to the half of speci-
fied torque, and then tighten the handlebar clamp bolts 1 and
2 to the specified torque.
$ Handlebar set bolt: 23 N
.
m (2.3 kgf
.
m, 16.5 lb-f )
Install the handlebar set bolt cap.
Apply grease to the throttle cable end
For USA
# 99000-25030: SUZUKI SUPER GREASE “A”
For the other countries
# 99000-25010: SUZUKI SUPER GREASE “A”
Install the handlebars with the punch mark B aligned with the
handlebar clamp as shown.
Install the front brake master cylinder. ('7-17)
$ Front master cylinder mounting bolt: 10 N
.
m
(1.0 kgf
.
m, 7.0 lb-ft)

Table of Contents

Other manuals for Suzuki VL800

Related product manuals