EasyManua.ls Logo

Suzuki VL800 - Page 437

Suzuki VL800
639 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
VL800K5 (’05-MODEL) 14-85
ACTIVE CONTROL INSPECTION
1) Set up the SDS tool. (Refer to the SDS operation manual for
further details)
2) Turn the ignition switch ON.
3) Click “PAIR Sol operating control”
1.
4) Click each button
2.
At this time, if an operation sound is heard from the PAIR
control solenoid valve, the function is normal.

Table of Contents

Other manuals for Suzuki VL800

Related product manuals