EasyManua.ls Logo

Trane CVHH - Page 107

Trane CVHH
111 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CVHH Annual Inspection List Revised: 10 Oct 2014
CVHH Annual Inspection List
Follow the annual maintenance instructions provided in the text of this manual, including but
not limited to:
Compressor Motor
Motor continuity.
Motor meg test.
•Check motor terminals.
Inspect motor terminal board.
Starter or AFD
Inspect starter contacts.
Check all connections per manufacturer specifications.
Follow all manufacturer recommendations for starter or AFD maintenance.
Inspect/clean/service the AFD cooling system (water- or air-cooled AFD).
Record all applicable starter or starter component settings.
Oil System
Annual oil analysis (follow recommendations).
Clean and lubricate oil system as required.
Electrical inspection.
Pump motor continuity check.
Run oil pump and check differential oil pressure.
Condenser
Inspect for fouling and scaling in tubes.
Check operation of condenser water flow sensing device.
Factory recommendation to eddy current test tubes every three years.
Evaporator
Inspect for fouling and scaling in tubes.
Check operation of evaporator water flow sensing device.
Factory recommendation to eddy current test tubes every three years.
Control Circuits
Verify control parameters.
Test appropriate sensors for accuracy.
Ensure sensors are properly seated in wells with thermopaste installed.
Check evaporator leaving water temperature low temperature cutout setpoint.
Condenser high pressure switch check-out.
Check adjustment and operation of the inlet guide vane actuator.
Leak Test Chiller
Check purge times and unit performance logs. If warranted, pressure leak test.
Review oil analysis. If required, submit refrigerant sample for analysis.
Inspect unit for any signs of refrigerant or oil leakage.
Check unit for any loose bolts on flange, volutes, or casing.
Purge Unit
Review this manual and follow maintenance and/or inspection items identified.
Review purge pump out data.
Review overall operation of purge and service as necessary.
Exterior
Inlet guide vane linkage.
Clean and touch-up painted surfaces as needed.
Repair deteriorated, torn, or missing insulation.

Table of Contents

Related product manuals