EasyManua.ls Logo

Trane CVHH - Electrical Requirements; Installation Requirements

Trane CVHH
111 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
46 CVHH-SVX001A-EN
Electrical Requirements
Installation Requirements
Note: Graphic labels (shown above) are used for CE
application only.
Important:
Before servicing, disconnect all power sources and
allow at least 30 minutes for capacitors to discharge.
All electrical enclosures—unit or remote—are IP2X.
Unit-mounted starters are available as an option on most
units. While this option eliminates most field-installed
wiring requirements, the electrical contractor must still
complete the electrical connection for the following:
power supply wiring to the starter,
other unit control options present, and
any field-supplied control devices.
As you review this manual, along with the wiring
instructions presented in this section, keep in mind that:
All field-installed wiring must conform to National
Electric Code (NEC) guidelines, and any applicable
national, state, and local codes. For the USA, be sure to
satisfy proper equipment grounding requirements per
NEC.
Compressor motor and unit electrical data (including
motor kW, voltage utilization range, rated load amps,
and locked rotor amps) is listed on the chiller
nameplate.
All field-installed wiring must be checked for proper
terminations, and for possible shorts or grounds.
Note: Always refer to the actual wiring diagrams that
shipped with the chiller or the unit submittal for
specific as-built electrical schematic and
connection information.
Do not modify or cut enclosure to provide electrical access.
Removable panels have been provided, and any
modification should be done away from the enclosure. If
the starter enclosure must be cut to provide electrical
access, exercise care to prevent debris from falling inside
the enclosure. Refer to installation information shipped
with the starter or submittal drawings.
Electrical Requirements
Before wiring begins, observe the following electrical
requirements:
Follow all lockout-tagout procedures prior to
performing installation and/or service on the unit.
Always wear appropriate personal protective
equipment.
Wait the required time to allow the capacitor(s) to
discharge; this could be up to 30 minutes.
Verify that all capacitors are discharged prior to service
using a properly rated volt meter.
Use appropriate capacitor discharge tool when
necessary.
Comply with the safety practices recommended in
PROD-SVB06*-EN.
WARNING
Proper Field Wiring and Grounding
Required!
Failure to follow code could result in death or serious
injury. All field wiring MUST be performed by qualified
personnel. Improperly installed and grounded field
wiring poses FIRE and ELECTROCUTION hazards. To
avoid these hazards, you MUST follow requirements for
field wiring installation and grounding as described in
NEC and your local/state/ national electrical codes.
X39003892001A
NOTICE:
Starter Component Damage!
Failure to remove debris from inside the starter panel
could result in an electrical short and could cause
serious starter component damage.

Table of Contents

Related product manuals