EasyManua.ls Logo

Trane CVHH - Page 4

Trane CVHH
111 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Introduction
4 CVHH-SVX001A-EN
Trademarks
All trademarks referenced in this document are the
trademarks of their respective owners.
Revision History
CVHH-SVX001A-EN (10 Oct 2014)
First version of this literature
Factory Warranty Information
Compliance with the following is required to preserve the
factory warranty:
All Unit Installations
Startup MUST be performed by Trane, or an authorized
agent of Trane, to VALIDATE this WARRANTY. Contractor
must provide a two-week startup notification to Trane (or
an agent of Trane specifically authorized to perform
startup).
Additional Requirements for Units Requiring
Disassembly
When a new fully assembled chiller is shipped and
received from our Trane manufacturing location and, for
any reason, it requires disassembly or partial
disassembly—which could include but is not limited to the
evaporator, condenser, control panel, compressor/motor,
purge, factory-mounted starter or any other components
originally attached to the fully assembled unit
compliance with the following is required to preserve the
factory warranty:
Trane, or an agent of Trane specifically authorized to
perform start-up and warranty of Trane
®
products, will
perform or have direct on-site technical supervision of
the disassembly and reassembly work.
The installing contractor must notify Trane—or an
agent of Trane specifically authorized to perform
startup and warranty of Trane
®
products—two weeks
in advance of the scheduled disassembly work to
coordinate the disassembly and reassembly work.
Start-up must be performed by Trane or an agent of
Trane specifically authorized to perform startup and
warranty of Trane
®
products.
Trane, or an agent of Trane specifically authorized to
perform start-up and warranty of Trane
®
products, will
provide qualified personnel and standard hand tools to
perform the disassembly work at a location specified by
the contractor. Trane, or an agent of Trane specifically
authorized to perform start-up and warranty of Trane
products, w ill perform or have direct on-site supervision of
the disassembly and reassembly work. The contractor
shall provide the rigging equipment such as chain falls,
gantries, cranes, forklifts, etc. necessary for the
disassembly and reassembly work and the required
qualified personnel to operate the necessary rigging
equipment.
Important: Any deviation from these requirements
must be agreed upon prior to startup in a
written agreement from Trane.

Table of Contents

Related product manuals