EasyManua.ls Logo

Xerox WorkCentre Pro 423 - Page 437

Xerox WorkCentre Pro 423
619 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
WorkCentre Pro 423/428 03/02 CHAPTER 6 GENERAL
6-20 6.5 Installation
9. Connect the IIT to IOT using cable. (Figure-9)
(Figure-9) j0hn6509
Note After plugging the cable in, tighten the screws (locking knobs) securely. If the
connection is not secure, there may be no messages displayed on the IIT UI panel.
10. Install the Fall Prevention Foot. (Figure-10).
CAUTION
Be sure to install the Fall Prevention Foot to prevent Main Unit from falling.
1) Remove the Lids (2) from the 2-Tray Module Right Cover.
2) Install the Foot.
3) Tighten the Screws (2).
4) Tighten the Screw (black)(1).
(Figure-10) j0hn6510
11. Connect the line. (Fax equipped models only) (Figure-11)
1) Connect ”LINE1” of the IOT Rear Cover with the line cable and another with the line
rosette.
(Figure-11) j0hn6511
12. Unlock the castors once.
13. Move the machine to the installation place and lock the castors. (Figure-12)
1) Pull down the front caster levers (2) to lock.
(Figure-12) j0hn6512

Table of Contents

Other manuals for Xerox WorkCentre Pro 423

Related product manuals